Synaptics logo
Synaptics logo

Festive Engineering

Our engineers worked through the Christmas break to deliver a bespoke extract fan array for an office building in Hemel Hempstead. Designed and installed by Synaptics Energy Solutions, the fan array will provide a maximum 20 m3/s of extraction from the occupied space, replacing fans installed in 1989, before our Commissioning Manager was born!

Share this post

Recent Posts

2025 © Synaptics Energy Solutions Ltd